The AIOX Framework

From problem to production in five weeks

The AIOX Framework is AI Implementation for Outcome eXecution: a five phase, fixed price method that ships working software every week and reaches production in 25 business days, after a one day workshop that sets the scope and the price.

The problem with traditional delivery

What a traditional engagement costs you before it delivers

Six months before anything runs

Six to eight weeks of discovery before a single line of code exists. By the time software appears, the problem has moved.

You pay for documents, not software

Requirements packs, specs and status reports consume the budget. None of it runs, and none of it proves the approach works.

All the risk lands at the end

Integration and testing are saved until last. The first time the system works as a whole is also the first time its problems appear.

Five phases, drawn to scale

Working software every week

5 weeks, 25 business days, fixed price. Hardening, testing and validation happen inside every week.

  1. Day Zero

    Explore 1 day workshop, $2,500 + GST

    A paid discovery workshop with your stakeholders in the room. AI turns the discussion into wireframes during the session. You leave with a concept report, agreed success criteria and a fixed price.

  2. Phase 1

    Design 2 days

    Wireframes become a clickable prototype you walk your real workflows through. Changes happen live. Sign off, and the prototype becomes the build spec. Or stop here: that is the break clause.

  3. Phase 2

    Build 20 days, 4 weekly releases

    Monday agree the increment, Tuesday AI generates and engineers direct, Wednesday integrate and harden, Thursday real users try it, Friday demo and deploy to production. Every week ends shippable.

  4. Phase 3

    Launch 3 days

    Training and documentation were prepared during build week four. Progressive rollout from a pilot group, rollback at every stage. Go live is a change of audience, not a change of environment.

  5. Phase 4

    Adopt Ongoing

    Usage tracked against the Day Zero success criteria. Floor support, process support, AI handled first line triage and a maintained enhancement backlog. Delivered is not the same as used.

Optional module

Internet Facing Hardening

For any application exposed to the internet. No impact on the five week timeline.

Full OWASP Top 10 assessment, broken access control and authentication testing, injection and cross site scripting testing, dependency and supply chain scanning, and our in house penetration testing tool run against the live build. You get a pen test report written for your CISO, a remediation log with before and after evidence, and a re test ahead of go live.

Optional module

Test Automation

Run by a separate specialist alongside Build. No impact on the five week timeline.

Playwright end to end tests written with each weekly build, critical journeys first, cross browser on Chromium, Firefox and WebKit, wired into CI so every deployment is gated by a passing run. You keep the suite in your repository with a runbook and a handover session.

Inside a build week

The weekly rhythm

Monday

Agree this week's increment with you.

Tuesday

AI generates, engineers direct and review.

Wednesday

Integrate, harden, security scan.

Thursday

Real users try it, fixes land the same day.

Friday

Demo, deploy to production, plan next week.

Every week delivers a production deployment, working software your users can use immediately, a demo recording, a decision log and documentation generated from the working code. Stop us after week two and you still have working software in production.

Core principles

Five rules we do not bend

Working software over documentation

We do not write requirements documents that go out of date before development starts. Stakeholders react to real software, not wireframes on a slide.

AI generates, humans direct

AI writes about 70% of the code. Engineers direct every decision and review every line. Structured, governed development, not vibe coding.

No production code until you sign off the prototype

Two days of AI assisted design removes the biggest waste in software delivery: building the wrong thing well. The prototype becomes the specification.

Every week ends shippable, tested and hardened

Hardening, testing and validation happen inside the week they belong to. There is no integration phase and no testing tail.

Validate with real users on real data

No synthetic data, no scripted scenarios. Your people perform their actual tasks with their actual data every Thursday.

Measured against a traditional SI engagement

How we calculate the comparison

Every claim, and the arithmetic behind it.

8x

Faster delivery

42 weeks for a traditional SI engagement against 5 weeks. 42 divided by 5 is 8.4, published as 8x.

65%

Less of your team's time

About 432 hours of business user time across discovery, requirements, UAT and launch, against about 131 hours concentrated in weekly demos. 70% lower, published as 65%.

95%

Less capital at risk

A 25% mobilisation on 3,192 hours commits 798 hours before work starts. AIOX commits 23 hours to reach a working prototype, with a break clause after Design. 97% lower, published as 95%.

Assumptions: a 42 week traditional engagement from a large systems integrator such as Accenture or Deloitte, a blended team of two, 38 hour weeks, a 25% mobilisation payment and three business stakeholders. The same scope is delivered in both cases. The business opportunity cost of the 37 week difference is excluded.

MetricTraditional SIAIOX Framework
Time to production42 weeks, 10+ months5 weeks, 25 business days
Discovery6 to 8 weeks, produces a document1 day, produces wireframes and a fixed price
First working softwareAfter developmentDay 2, a clickable prototype; day 7, the first production release
Capital committed before work starts25% mobilisation10% at Design kickoff, break clause at day 2
Integration and testingSaved until the endInside every week
Go liveBig bang releaseChange of audience, software already in production
WarrantyVaries60 days included

The 35% on time and on budget figure is the widely cited industry success rate for enterprise software projects.

Fixed price, clear deliverables

Tiered investment

All prices are in Australian dollars and exclude GST. The Day Zero Workshop is $2,500 + GST, invoiced on its own and credited against the build if you proceed. The build price is fixed in the proposal you receive at the end of the workshop.

TierInvestmentScope
Essentials$25K to $35K + GST, fixedSmaller companies, focused scope, single workflow
Standard$50K to $75K + GST, fixedMid market, multiple integrations, the full framework
Enterprise$75K and above + GST, fixedComplex environments, extensive integrations, change management

Included in every tier

  • Wireframes, concept report and success criteria from your Day Zero Workshop, carried into Design
  • Clickable prototype and signed off scope
  • Four weekly production releases
  • Launch with role based training, fixed hours
  • Documentation generated from the working code
  • 60 day defect warranty on the unmodified system
  • AIOX Run, no extra cost

Priced separately

  • The Day Zero Workshop, $2,500 + GST, credited against the build if you proceed
  • Internet Facing Hardening module
  • Test Automation module
  • Data migration, time and materials
  • Adopt phase support beyond the warranty
  • Enhancements after Launch

Payment milestones

Percentages are of the fixed build price.

Day Zero Workshop$2,500 + GST, invoiced separately
Design kickoff, day 110%
End of build week two, day 1240%
End of build week four, day 2240%
Launch complete, day 2510%

Fixed price guarantee

If five weeks is not enough for the agreed scope, remaining items move to the next build. We do not expand the invoice.

AIOX Run

Complete visibility from day one

Every engagement runs on AIOX Run, our operational platform: a project dashboard, a documentation hub, direct collaboration with the team and knowledge capture for every decision. Included at no extra cost. About AIOX Run.

Frequently asked questions

How is the AIOX Framework different from agile or other rapid delivery approaches?

Three things. Nothing is built until you have signed off a clickable prototype, so the biggest source of waste, building the wrong thing well, is removed in two days. Every week ends with a production deployment, so there is no integration phase and no testing tail. And the price is fixed before the build starts, with a break clause after Design.

What does the Day Zero Workshop cost?

$2,500 + GST, invoiced on its own. It is credited against the build price if you proceed, so if you go ahead the workshop costs you nothing extra. If you stop after the workshop you keep the wireframes, the concept report and the fixed price proposal.

What happens at the Day Zero Workshop?

A one day, paid workshop with your stakeholders in the room. We uncover and agree the business problem worth solving, define two or three measurable success criteria, identify integrations, data sources and constraints, and AI turns the discussion into wireframes during the session. You leave with the wireframes, a project concept report, baselined success criteria and a fixed price proposal for the five week build.

What if five weeks is not enough for the agreed scope?

Remaining items move to the next five week build. The invoice does not grow. Scope is managed at the workshop and at the Design sign off, not through change orders.

What is the break clause?

At the end of Design, day two, you have a clickable prototype of the full solution and a signed off scope. You commit to the build, or you stop there. No production code is written before that point.

Can you integrate with our existing systems?

Yes. Integrations are identified on Day Zero and connected during Build. Microsoft 365, Teams, SharePoint, SQL and most systems with an API are routine. Data migration is priced separately on time and materials.

What happens to the code after the engagement?

It is yours. Code, tests and documentation sit in your repository and your Azure tenant. Documentation is generated from the working code, so it matches what actually runs.

What does the 60 day warranty cover?

Defects in the unmodified system, fixed at no additional cost, for 60 days after Launch. Enhancements, extended support and changes made by other parties sit outside it.

Do you work with our team or replace them?

With them. Your stakeholders are in the workshop, walk the prototype, agree each weekly increment on Monday and try the build on Thursday. Your technical team can take the handover at the end of Launch or extend the Playwright suite we leave behind.

Where is our data hosted?

In your own Microsoft Azure tenant, in your region. Client dedicated, no multi tenant mixing, and we never train AI models on your business.

Which AI models do you use?

Whichever the solution calls for. Commercial models from OpenAI or Anthropic, or open source models from Meta, Google, Qwen and DeepSeek run with Ollama inside your environment. Document extraction uses Docling. Code is generated with Claude and Cursor, directed and reviewed by engineers.

Let's start with a Day Zero Workshop

From problem to production in five weeks, at a price agreed before we start. Start with a Day Zero Workshop.