The Launch phase of the AIOX Framework from AiOutcomeX takes three days, days 23 to 25, because by then the software has been in production for four weeks. Go live does not move the system anywhere. It widens who uses it, from a pilot group outward, with rollback available at every stage. Training and documentation were prepared during build week four, so the three days are spent on people, not infrastructure.
That is what we mean when we say launch is a change of audience, not a change of environment. The phrase describes a different kind of risk from the one most people expect at go live.
Why a traditional go live is dangerous
In a traditional engagement, deploy is the last stage and it is a big bang. Development and testing run sequentially, integration is saved until the end, and the production environment is often the last environment the system meets. The first day real users touch it as a whole is the day the whole business depends on it.
The AIOX Framework removes that moment by making it ordinary. Every build week ends with a production deployment on Friday. We wrote about why that means there is no integration phase. By the end of build week four there have been four production deployments, each one tested by real users on real data the Thursday before. The environment has nothing left to prove.
What does the Launch phase of an AI build involve?
Three days of progressive rollout, role based training and a cutover plan with rollback at every stage. Here is what each part means in practice.
- Progressive rollout from a pilot group. The system goes to a small group first, then widens. Each step is a decision, taken with you, based on what the previous group found.
- Rollback at every stage. If a wider group surfaces something the pilot did not, the rollout stops and steps back. Nothing about the production environment changes in the process, which is why rollback is cheap.
- Role based training, fixed hours. Each role is trained on the tasks it will actually perform, using the system as it runs. The training material was prepared during build week four from the working software, not written in advance from a specification.
- Documentation generated from the working code. Handed over as part of Launch, and true to the system because it was produced from it.
The cutover and rollback plan, the training material and the rollout record all sit on AIOX Run alongside everything from the earlier phases.
What finishes at Launch, and what does not
Launch is where the fixed price engagement completes. The final 10% milestone is due at Launch complete on day 25, and the 60 day defect warranty starts: defects in the unmodified system are fixed at no additional cost. Enhancements, extended support and changes made by other parties sit outside it.
Two things carry on after Launch. The code, tests and documentation are yours and sit in your repository and your Azure tenant, so your own team can take it from here if that is the plan. Or Adopt begins, where usage is measured against the success criteria set at Day Zero, because delivered is not the same as used. That phase gets its own post.
The practical consequence for a buyer is that the question to ask about go live is not whether the system will work in production. It has been working in production since day 7. The question is who should use it first, and the three days of Launch exist to answer that carefully.
If your last go live was a weekend nobody wants to repeat, book a Day Zero Workshop and see how the five weeks end differently.
In short
- Launch on the AIOX Framework is three days, days 23 to 25, and the software is already in production, so go live is a progressive rollout from a pilot group with rollback at every stage.
- Training is role based with fixed hours and was prepared during build week four from the working software, and documentation is generated from the code that runs.
- The next step after Launch is the 60 day defect warranty and, if you want it, Adopt, where usage is measured against your Day Zero success criteria.