Only 35% of enterprise software projects deliver on time and on budget. That is the widely cited industry success rate, and it means that for a typical project the odds of getting what you were promised, when you were promised it, for the price you agreed, are about one in three. The other two thirds slip, overrun or both.
It is the one external statistic we quote on the AiOutcomeX site, and we quote it because it frames every decision in the AIOX Framework. This post is about what the number means if you are buying software for a mid market business, and about the three reasons we think sit behind it.
What does a 35% success rate mean for a mid market buyer?
It means the default outcome of a traditional engagement is a late, over budget project, and you should price that in before you sign. A large enterprise can absorb a project that runs months late and costs more than planned. A mid market business usually cannot. The budget was this year’s budget, the sponsor was one person, and the opportunity the software was meant to capture had a window.
It also means that the question to ask a vendor is not “can you deliver this” but “what in your method stops this project from joining the other two thirds”. A confident team and a good plan are not an answer. Every one of the projects that slipped had both.
The three reasons behind the number
We see the same three causes on project after project, and they are built into the traditional method rather than being mistakes anyone makes.
The first is six months before anything runs. Six to eight weeks of discovery pass before a single line of code exists. By the time software appears, the problem has moved, and the project is already chasing a target it cannot see. We wrote about this in the six month gap before anything runs.
The second is paying for documents, not software. Requirements packs, specs and status reports consume the budget. None of it runs, and none of it proves the approach works. A project can be on schedule for months while producing nothing that could be shown to fail.
The third is that all the risk lands at the end. Integration and testing are saved until last. The first time the system works as a whole is also the first time its problems appear, and by then the budget and the calendar are both nearly spent. That is where the overrun comes from. It is not that the last phase was planned badly. It is that the last phase is where every earlier assumption is finally tested.
What changes the odds
The odds change when the method stops hiding problems until the end. Each of the three causes has a direct counter.
Against the six month gap: a one day workshop instead of six to eight weeks of discovery, and a clickable prototype two days later.
Against paying for documents: working software every week, with a production deployment every Friday, so the budget buys things that run.
Against risk at the end: integration, hardening and testing inside the week they belong to, so there is no integration phase and no testing tail.
Those three counters are the AIOX Framework from AiOutcomeX, and they are why we can offer fixed price software development rather than a time and materials estimate with a risk margin. You can read how we structure the five weeks on the framework page. The price is fixed because the method removes the places where projects usually go wrong, not because we are braver than other vendors.
In short
- Only 35% of enterprise software projects deliver on time and on budget, so the default outcome is late and over budget.
- The three causes are discovery before code, budget spent on documents, and integration and testing saved until the end.
- Pick a method that removes those three causes, and ask any vendor to show you where theirs does.
If you want to talk through what the number means for your project, read about who we are and how we work.