An AI project should have two or three measurable success criteria, agreed and baselined at the Day Zero Workshop before any design or build begins. In the AIOX Framework those criteria are the standard the whole engagement is judged against: the Adopt phase tracks usage against them after go live, and the outcome report answers them directly. Forty criteria measure activity. Two or three measure an outcome.
This is one of the quieter rules in the AIOX Framework from AiOutcomeX, and it does more work than most of the louder ones. This post is about why the number is small, and what happens to it after Launch.
How many success criteria should an AI project have?
Two or three. Each one should be a measure your business already understands, baselined on the day so there is a before to compare the after against, and specific enough that the Thursday user sessions during Build can tell whether the increment is moving it.
A good criterion reads like a sentence a manager would say: the time from request to approval, the share of assessments completed without rework, the number of hours a senior person spends on tasks a newer person could do with the right tool. A bad criterion reads like a feature: has search, supports export, integrates with SharePoint. Features are things the software does. Criteria are things the business gets.
If a project cannot be judged on two or three numbers, it is not one project yet. It is two or three projects, and the Day Zero Workshop is where that gets noticed and the scope is split before the price is fixed.
Why forty is worse than three
Forty criteria feel safer. Every stakeholder gets one, nothing is left out, and the document looks thorough. Three problems follow.
Nobody can hold forty criteria in their head, so nobody makes decisions against them. The Monday conversation that agrees the week’s increment needs a reason to choose one thing over another. “Does this move criterion two” is a question that can be answered in the room. “Does this move any of the forty” is not.
Forty criteria never all move. Some go up, some go down, most do not change, and at the end of the project both sides can tell whichever story they prefer. Two or three criteria, baselined, either moved or they did not.
Forty criteria describe the system you imagined. Three describe the problem you have. When Thursday’s real users find that the workflow is different from the one everyone described, as we covered in validate with real users on real data, three criteria survive the correction because they were about the outcome. Forty do not, because they were about the design.
What happens to the criteria after Launch
They become the measure of Adopt. Delivered is not the same as used, and the Adopt phase exists because a system in production with nobody in it has not solved anything.
After go live, usage is tracked against the Day Zero success criteria. Floor support and process support help people through the first weeks. AI handles first line triage. An enhancement backlog is maintained from what real use reveals. All of it sits in AIOX Run, which carries the usage reporting and the outcome report through Adopt, next to the criteria that were written down on day zero.
That is the reason the criteria are baselined on the day rather than written at the end. A number recorded before the build cannot be adjusted to fit the result. The outcome report says what the three criteria were, what they were on Day Zero, and what they are now. If they moved, the project worked. If they did not, we need to find out why, and that is a far more useful conversation than a list of forty features that were all delivered.
Success is measured against the criteria agreed at the Day Zero Workshop, not against hours billed. Two or three of them is enough to tell the truth.
In short
- The AIOX Framework sets two or three measurable success criteria at the Day Zero Workshop and baselines them on the day.
- Forty criteria describe the design you imagined; two or three describe the business outcome, and they survive the corrections real users make during Build.
- Adopt tracks usage against those criteria after go live, and the outcome report answers them directly.
To see where Day Zero and Adopt sit in the five phases, read how the five weeks work.