Eight times faster, and how we calculate it

Matthew Yarlett 25 February 2026 3 minute read

The AIOX Framework from AiOutcomeX reaches production in 5 weeks, 25 business days. A traditional systems integrator engagement for the same scope takes 42 weeks, more than 10 months. 42 divided by 5 is 8.4, which we publish as 8x faster. The rest of this post is the arithmetic and the assumptions behind it, so you can check the claim rather than take it.

We put the working on the site because a speed claim without its assumptions is just marketing. If you disagree with an assumption, you can rerun the sum with your own number.

Where the 42 weeks comes from

The comparison assumes a traditional engagement from a large systems integrator such as Accenture or Deloitte, delivering the same scope that a five week AIOX build delivers. The 42 weeks breaks down along the stages those engagements follow.

  • Discovery and requirements: 6 to 8 weeks of workshops and documents.
  • Design: static specifications.
  • Development and testing: sequential, with integration saved until the end.
  • Deploy: a big bang release.

The total is 42 weeks, 10+ months, before the business has software it can use. That is not an exaggeration of how large programs run. It is the shape of them, and it is why only 35% of enterprise software projects deliver on time and on budget, a figure we looked at in an earlier post.

How long does a fixed price AI build take?

Five weeks, 25 business days, from the first day of Design to the end of Launch, after a one day Day Zero Workshop that sets the scope and the price. The five weeks are drawn to scale on the AIOX Framework page, and they break down like this.

  • Day Zero: a one day Explore workshop. Wireframes are produced in the room, along with a concept report, two or three success criteria and a fixed price.
  • Design: 2 days to a clickable prototype you sign off. That is day 2, and it is the first working software you see.
  • Build: 20 days, four weekly production releases, each one hardened and tested inside its week. The first production release lands on day 7.
  • Launch: 3 days, progressive rollout with rollback.

Compare the first working software line. In the traditional engagement, it arrives after development. In the AIOX Framework, it is a clickable prototype on day 2 and a production release on day 7.

The assumptions, stated

Every number in the comparison rests on the same set of assumptions, and we publish them next to the figures.

  • A 42 week traditional engagement from a large systems integrator.
  • A blended team of two, working 38 hour weeks.
  • A 25% mobilisation payment before work starts.
  • Three business stakeholders involved on the client side.
  • The same scope delivered in both cases.

One thing is deliberately left out. The business opportunity cost of the 37 week difference is excluded. If your business would have earned or saved something by having the software 37 weeks earlier, that is on top of the 8x, not inside it. We leave it out because it is different for every business and we would rather publish a number we can defend than a bigger one we cannot.

The last assumption is the rounding. 42 divided by 5 is 8.4, and we publish 8x. It is a small choice, but it is the same choice we make on every figure in the comparison: the published number is never higher than the calculation. The same approach produces the two companion figures on the site, 65% less of your team’s time and 95% less capital at risk, each of which has its own working and will get its own post.

If you want to walk through the comparison for your own project, book a Day Zero Workshop and we will run the sum on your scope before any clock starts.

In short

  • The AIOX Framework from AiOutcomeX delivers in 5 weeks against 42 weeks for a traditional SI engagement on the same scope; 42 divided by 5 is 8.4, published as 8x.
  • The assumptions are a large systems integrator, a blended team of two on 38 hour weeks, 25% mobilisation and three business stakeholders, with the opportunity cost of the 37 week gap excluded.
  • The next step is a one day Day Zero Workshop, $2,500 + GST, credited against the build if you proceed.

AIOX FrameworkDeliveryFixed price

Ready to move faster?

From problem to production in five weeks, at a price agreed before we start. Start with a Day Zero Workshop.