Five questions to ask before a Day Zero Workshop

Matthew Yarlett 14 October 2026 4 minute read

Before a Day Zero Workshop, settle five things: which single workflow you want built, who needs to be in the room, which systems and data the workflow touches, when you want the five weeks to start, and what two or three measurable results would tell you it worked. You do not need a requirements document. You need honest answers to those five questions, and the workshop does the rest in one day.

The Day Zero Workshop is the first phase of the AIOX Framework from AiOutcomeX. It costs $2,500 + GST, is credited against the build if you proceed, and you leave with wireframes, a concept report, baselined success criteria and a fixed price for the five week build. What happens on Day Zero describes the day itself. This post is about the week before it.

What should you prepare for a Day Zero Workshop?

Prepare answers to the five questions below, in writing, in a page or less. The workshop works because the right people react to wireframes of the right problem on the day. The preparation is what makes sure it is the right problem and the right people.

1. Which workflow?

One. The AIOX Framework builds one agreed scope in five weeks, and the workshop sizes that scope honestly before any clock starts. If you arrive with six problems, the first hour is spent choosing, and that is time the room could spend on wireframes. Pick the workflow that hurts most, and bring the others as a list for later. Larger programs are scoped as a series of five week builds, each one shipping working software, so nothing is lost by starting with one.

2. Who is in the room?

The people who do the work, not only the people who manage it. We come to you and run the workshop on site with your stakeholders, and AI turns the discussion into wireframes while it happens. Wireframes drawn from a manager’s description of a process look different from wireframes drawn from the person who runs it every day. You also want whoever can say yes to the fixed price, because the proposal lands at the end of the day.

3. Which systems does it touch?

Integrations, data sources and constraints are identified on Day Zero and connected during Build. Microsoft 365, Teams, SharePoint, SQL and most systems with an API are routine. Before the day, list every system the workflow reads from or writes to, where the data lives, and who owns access. If data migration is involved, say so, because it is priced separately on time and materials. On the build versus buy side, this is also where we confirm the right place to build inside the platforms you already run.

4. When do you want to start?

The five weeks run as 25 business days: two days of Design, twenty days of Build in four weekly production releases, three days of Launch. Real users try the build every Thursday, and your stakeholders agree each week’s increment on Monday. Pick a start where those people are available and where the business can absorb a progressive rollout at the end. The workshop fixes the price; the proposal fixes the timeline.

5. How will you know it worked?

Two or three measurable success criteria, not forty. They are baselined at the workshop and the Adopt phase measures usage against them after Launch, so they need to be things you can count: hours saved per engagement, days to turn a quote into a job, calls that no longer reach the office. Delivered is not the same as used, and these criteria are how we tell the difference. Two or three success criteria, not forty explains why fewer is better.

What you do not need

You do not need a requirements document, a vendor shortlist or a technical design. Those are what the workshop replaces. Six to eight weeks of traditional discovery produces a document; one day with the right people in the room produces wireframes, a concept report and a fixed price, all visible in AIOX Run from the first hour.

If the honest answer on the day is that a build does not make sense, or that you should buy rather than build, we tell you at the workshop and you keep everything it produced.

In short

  • Settle five things before a Day Zero Workshop: one workflow, the right people, the systems it touches, a start date and two or three measurable success criteria.
  • The workshop is $2,500 + GST, credited against the build, and produces wireframes, a concept report, success criteria and a fixed price in one day.
  • When you have the five answers, book a Day Zero Workshop.

Day ZeroAIOX Framework

Ready to move faster?

From problem to production in five weeks, at a price agreed before we start. Start with a Day Zero Workshop.