65% less of your team's time

Matthew Yarlett 11 March 2026 3 minute read

A traditional systems integrator engagement takes about 432 hours of business user time across discovery, requirements, UAT and launch. A five week build on the AIOX Framework from AiOutcomeX takes about 131 hours, concentrated in weekly demos and Thursday user sessions. That is 70% lower, which we publish as 65% less of your team’s time. The arithmetic and the assumptions are below.

This is the figure buyers ask about most once the price is settled, because the price is not the only cost. Every hour your people spend in workshops, reviewing documents or sitting in UAT is an hour not spent on the business.

Where 432 hours goes

The traditional number comes from the same model we use for the 8x speed comparison: a 42 week engagement from a large systems integrator, with three business stakeholders on the client side and the same scope as a five week AIOX build.

Those stakeholders are drawn into the engagement at four points. Discovery, where 6 to 8 weeks of workshops and interviews need them in the room. Requirements, where the documents produced by discovery need to be read, corrected and signed. User acceptance testing, which is saved until the end and is often the first time the business sees the whole system working. And launch, a big bang release that needs the business ready on the day. Across 42 weeks, that adds up to about 432 hours.

The hours are spread thin. A stakeholder might give two hours this week and six the next, over ten months, which makes the time hard to plan around and easy to underestimate.

How much of my team’s time does a five week build need?

About 131 hours in total, for the same three stakeholders, and it is scheduled rather than scattered. Here is where it goes.

  • Day Zero: a one day workshop with your stakeholders in the room. AI turns the discussion into wireframes during the session, so the day produces the brief rather than a plan to write one.
  • Design: two days walking a clickable prototype through real workflows, with changes made live.
  • Build: four weeks, each with a Monday session to agree the increment, a Thursday session where real users perform their actual tasks on real data, and a Friday demo. Fixes from Thursday land the same day.
  • Launch: three days, with role based training that was prepared during build week four.

Everything about the engagement, including each Monday increment, Thursday feedback, Friday demo recording and decision log, sits on AIOX Run, so time outside those sessions is not spent chasing status. We describe what the platform holds on the AIOX Run page.

Why the time per week is higher, and the total is lower

A fair reading of the two numbers is that the AIOX Framework asks more of your people in any given week and far less over the engagement. That is deliberate.

In a traditional engagement, business involvement is front loaded into discovery and back loaded into UAT, with a long quiet stretch between while the system is built from documents. The quiet stretch is where the risk accumulates. In the AIOX Framework, your people see working software every Thursday and a production deployment every Friday. The feedback that would have waited for UAT arrives in week one, when it is cheapest to act on.

So the oversight per week is heavier because it is doing real work. Each Thursday session replaces a slice of UAT. Each Monday agreement replaces a slice of requirements. Over five weeks that concentration adds up to about 131 hours instead of about 432, and to a team that has used the system before it launches.

The published figure is 65% rather than 70% for the same reason we publish 8x rather than 8.4x. The published number is never higher than the calculation.

If you want to see how those 131 hours would fall for your own stakeholders, book a Day Zero Workshop and we will map them before any clock starts.

In short

  • A five week AIOX Framework build needs about 131 hours of business user time against about 432 hours in a 42 week traditional engagement; 70% lower, published by AiOutcomeX as 65%.
  • The time is concentrated in Day Zero, two days of Design, weekly Monday, Thursday and Friday sessions during Build, and three days of Launch, with feedback arriving in week one rather than at UAT.
  • The next step is a one day Day Zero Workshop that sets the scope, the success criteria and a fixed price.

AIOX FrameworkDelivery

Ready to move faster?

From problem to production in five weeks, at a price agreed before we start. Start with a Day Zero Workshop.